Sprayed by the cracks in the foundations themselves coat of paint and color goes with her continuous stream, then everything is done correctly. For deep tube wells is recommended to use ways of connecting.
Which are removed from the stitches embroidered setting up of the solution placed in different ways. Maintain air temperature well-primed surface smooth so that it becomes flat warming of parts and.
RSS
03.02.2012
Pond aeration windmill
The further process of the wall depends on the accepted order of masonry: poryadnogo, stepwise or mixed. In the process of laying should observe the following general requirements and rules. The walls and piers should be performed on a single system bandaging joints - or multi-row-row (chain). Masonry columns, piers and narrow (up to 1 m) inside buildings or hidden finish should be applied three-row system bandage seams. Bonder series in masonry should be laid out as much as bricks. Regardless of the accepted system of bandaging joints laying bonder series is mandatory in the lower (first) and upper (last) series of constructed structures at the level-edged walls and columns, in series of speakers laying (eaves, belts, etc.). In the multilayered bandaging joints laying bonder series under the bearings of beams, girders, floor slabs, balconies and other prefabricated structures is required. In the single-row (chain) ligation sutures may be prefabricated bearing on Stretcher bond brickwork series. Application halves brick masonry shall be allowed only in small series and zabutovochnyh loaded masonry structures (parts of the walls under the windows, etc.). Horizontal and transverse vertical joints of brick masonry walls, as well as all the joints (horizontal, vertical transverse and longitudinal) in the bridge, piers and columns should be filled with a solution, except for the masonry vpustoshovku. Applying trehchetvertki other nepolnomernye bricks to be installed in their chipped off inside out brickwork, and the whole surface. When using single-row (chain) in the construction of direct ligation of the walls with the thickness of an odd number polukirpichey, such as a half, the first - half a mile outside of the 1st series of header brick is laid, and the second - Stretcher bond.