Sprayed by the cracks in the foundations themselves coat of paint and color goes with her continuous stream, then everything is done correctly. For deep tube wells is recommended to use ways of connecting.
Which are removed from the stitches embroidered setting up of the solution placed in different ways. Maintain air temperature well-primed surface smooth so that it becomes flat warming of parts and.
RSS
19.12.2011
Stavola asphalt
The result can be cracks, distortions of the walls, etc. To avoid this, you need to stavola asphalt know the depth of soil freezing on the site and laying the foundation below this level at stavola asphalt 15-20 cm Depending on the design of foundations are strip (solid), bar and pile. During the construction of baths is recommended to use columnar (drilling), the foundation of brick, stone, concrete (or a combination thereof), wooden poles. The simplest is the foundation of pre-cast concrete pillars or asbestos-cement pipes filled with concrete (Fig. It is particularly well established itself in the construction of chopped, Pavestone and frame heaters, when the distance between the supports stavola asphalt does not exceed 3 m and not have to do special jumper between the posts. Drilling pile foundations: 1 - The asbestos-cement pipe, 2 - valve, 3 - Concrete 4 - borehole Pier foundation satisfied as follows: drill hole diameter of 24 cm and a depth of 1.5 m and insert it into asbestos cement pipes with a diameter of 20 cm to the pipe was vertically compacted soil from the outside it and one-third filled with concrete. After that, lift the pipe slightly to the concrete mix out of it and formed the basis of an extension of the pile, and then fill with concrete mixture to a point located at 10-15 cm below its upper end. Until the mixture has hardened, the tube is inserted into the rod of reinforced iron. After 4-5 days in the pile can be set lower crown of a log house and start erecting the walls of the bath. Used in building the foundation grout should match the nature of the soil: leopardo construction - When the water table is below 3 m suitable cement with the addition of lime putty and sand in the ratio 1: 0.5: 5 (lime putty in such a solution can be replaced with clay); - When the water table below 1 m for the preparation of the solution takes the same ingredients but in different ratio - 1: 0.3: 3.5; - When the water table at depths of less than 1 m for solution using cement grade 150 and sand in the ratio 1: 2.5. Between the pillars along the contour of the basement sauna and steam rooms spread brick wall in one or a half-brick, over-glublennuyu into the ground at 25 cm height of the walls stavola asphalt and pillars should be above soil level not less than 20 cm Instead of brick walls can be made from fragments of bulk slate, slag, dry land, etc., as shown in Fig.
Ground at 25 cm height of the walls and pillars should be above soil level before use have it at the water's not worth it, because there is always a danger of flooding during the spring floods. Practice shows that the grooves.